Tcl · Module 23
Floorplan Automation
A floorplan command will happily create a die too small for the design it has to hold. The numbers that say so are arithmetic, and checking them costs nothing.
Intermediate16 min readtcledapart-iiphysical-designfloorplanutilisation
Part II · Module 23 · Chapter 23.1 · Floorplan Automation
Physical design turns a netlist into geometry, and the floorplan is the first decision: how big the die is, where the core sits, where the I/O goes.
Every step in this module shares one property, which is why the module exists in this form: a physical-design command succeeds on inputs that cannot work. So each step needs a report that proves it did what the script asked. This chapter establishes the pattern on the cheapest step.
1. What the floorplan fixes
Three things, and everything downstream depends on them:
- The die size — the outer boundary.
- The core area — the region cells are placed in, inside a margin left for I/O and seal ring.
- Where the I/O sits, which decides where signals enter and therefore which paths are long.
2. Scripting it
create_floorplan -die_width 1000 -die_height 1000 -core_margin 50Command names and options differ by vendor; find yours in the reference (Chapter 17.6). What is consistent is that the parameters are numbers, which means they can be computed, checked and recorded — Part I work on the quantities the command was given.
3. The numbers it implies
puts [format " die area : %.0f" [die_area]]
puts [format " core area : %.0f" [core_area]]
puts [format " cell area : %.0f" $::pd::cell_area]
puts [format " utilisation : %.1f%%" [utilisation]]
puts [format " aspect ratio : %.2f" [aspect_ratio]]=== floorplan, and the numbers it implies ===
die area : 1000000
core area : 810000
cell area : 486000
utilisation : 60.0%
aspect ratio : 1.00Two derived quantities matter more than the raw sizes:
- Utilisation — cell area divided by core area. How full the core is before placement starts.
- Aspect ratio — core width divided by height.
Both are division. Neither needs a tool to compute, which means both can be checked before anything expensive happens.
4. Deriving the die instead of guessing
§3 computed utilisation from a die size. The more useful direction is the other one: the cell area is a fact about the design, the target utilisation is a flow decision — so the die size can be solved for rather than guessed and corrected.
proc die_for_target {cell_area target_pct margin} {
if {$target_pct <= 0 || $target_pct >= 100} {
error "target utilisation must be between 0 and 100, got $target_pct" {} {PD BADTARGET}
}
set core_area [expr {100.0 * $cell_area / $target_pct}]
set core_side [expr {sqrt($core_area)}]
return [expr {ceil($core_side + 2.0 * $margin)}]
}Three lines of arithmetic, run in both directions to check they agree:
=== derive the die instead of guessing ===
cell area : 486000
target util : 60.0%
core margin : 50
derived side : 1000
achieved util : 60.0%
aspect ratio : 1.00The die comes back as 1000, the hard-coded value from §2 — which is the point: that number was never arbitrary, it was this calculation done once by hand and then frozen into the script. Writing the calculation down instead means it stays correct when the design grows.
Change the target and the die follows:
=== the same design at a tighter target ===
derived side : 880
achieved util : 79.9%The guard is the other half:
=== an impossible target is refused ===
1 / target utilisation must be between 0 and 100, got 100.0A target of 100% asks for a core exactly the size of the cells, with no space for a single wire; a target of 0 divides by zero. Neither is a typo anyone makes twice, and both produce a number the rest of the script would use without complaint — so the procedure refuses them at the point where the mistake is still legible. That is Chapter 14.11's argument about validating an argument where it is understood rather than where it explodes.
Note sqrt assumes a square core. A real derivation takes the target aspect ratio as a parameter too, and a block with a fixed edge — against a die boundary, or beside a hard macro — has one dimension given and solves for the other.
5. The floorplan that cannot work
=== a floorplan that is too small for the design ===
core area : 435600
utilisation : 111.6% <- too high to place and routeA bad shape fails differently and just as quietly:
=== and one with a bad aspect ratio ===
aspect ratio : 5.75 <- long and thin
utilisation : 52.8%Utilisation is comfortable. The core is nearly six times wider than it is tall, so any path crossing it is long, routing resources in one direction are scarce, and the clock tree has to span a shape it was not designed for. Placement will run and produce a result that times badly for reasons that are not visible in the netlist.
6. The check
proc check_floorplan {min_util max_util min_ar max_ar} {
set problems 0
set u [utilisation] ; set a [aspect_ratio]
if {$u > $max_util} {
puts stderr [format " ERROR utilisation %.1f%% is above the %.0f%% limit" $u $max_util] ; incr problems
} elseif {$u < $min_util} {
puts stderr [format " WARNING utilisation %.1f%% is below %.0f%% — the die may be larger than needed" $u $min_util]
} else {
puts [format " ok utilisation %.1f%%" $u]
}
if {$a > $max_ar || $a < $min_ar} {
puts stderr [format " ERROR aspect ratio %.2f is outside %.2f..%.2f" $a $min_ar $max_ar] ; incr problems
} else {
puts [format " ok aspect ratio %.2f" $a]
}
return $problems
}Across four dies:
--- die 1000x1000
ok utilisation 60.0%
ok aspect ratio 1.00
0 problem(s)
--- die 760x760
ERROR utilisation 111.6% is above the 85% limit
ok aspect ratio 1.00
1 problem(s)
--- die 2400x500
ok utilisation 52.8%
ERROR aspect ratio 5.75 is outside 0.50..2.00
1 problem(s)
--- die 1600x1600
WARNING utilisation 21.6% is below 50% — the die may be larger than needed
ok aspect ratio 1.00
0 problem(s)Four floorplans, four different verdicts, and the procedure is the shape from Chapter 22.9 §4: errors for what cannot work, a warning for what is merely questionable.
A die that is too large is wasteful, not broken — and making it an error would get the check switched off, which is exactly the failure mode that chapter described.
7. Where the limits come from
The numbers in check_floorplan are not universal, and inventing them would be worse than useless.
Utilisation limits come from the technology, the design style and how much the tool will need to add later — buffers, clock tree, spare cells. A design routed at a density that was fine five years ago may not route now. Take the number from your flow's own guidance, not from a tutorial.
Aspect ratio limits come from the block's role and the surrounding floorplan. A near-square core is the easy default; a long thin block may be exactly right if it sits along an edge.
What matters is that the limits are stated in the script, so the check is a decision somebody made rather than a judgement applied inconsistently — the same argument as Chapter 22.7 §6's acceptable-slack threshold.
8. Check before the expensive step
The ordering argument from Chapter 21.7 §6, applied here.
Floorplan creation takes seconds; placement takes a long time. A floorplan check costs microseconds — it is division — and it prevents a placement run on geometry that cannot succeed.
create_floorplan -die_width $W -die_height $H -core_margin $M
if {[check_floorplan 50 85 0.5 2.0] > 0} {
error "floorplan is not usable" {} {PD BADFP}
}
place_design ;# only nowThree lines between the two, and they are the difference between a failure in the first second and a failure after an hour.
9. Exercises
Exercise 1. What three things does the floorplan fix?
Exercise 2. How are utilisation and aspect ratio computed?
Exercise 3. Why derive the die size from the cell area and a target rather than hard-code it?
Exercise 4. The derived die achieves 79.9% against an 80% target. Why is that the right direction to miss by?
Exercise 5. Why does die_for_target refuse a target of 100%?
Exercise 6. Utilisation is 111.6% and the command succeeded. What does that tell you about physical-design commands generally?
Exercise 7. The aspect-ratio case had comfortable utilisation. Why is it still a problem?
Exercise 8. Why is a too-large die a warning rather than an error?
Exercise 9. Why should the limits live in the script rather than in somebody's judgement?
Exercise 10. Why check the floorplan before placement rather than after?